PARTS LIST
| Item No. |
Part Number |
Qty / Pump |
Description |
| 1 |
01-0046125 |
1 |
Lever Pin—Steel—3/8” x 1‐3/4” |
| 2 |
02-0000986 |
2 |
Cotter Pin |
| 3 |
03-0008257 |
1 |
Lever Link—Cast Iron |
| 4 |
04-0008235 |
1 |
Plunger Pin—Steel |
| 5 |
05-0008270 |
1 |
Packing Gland—Cast Iron |
| 6 |
06-0008272 |
5 |
Gland Packing |
| 7 |
07-0044073 |
1 |
Lever with Drilled Holes |
| 8 |
08-0008273 |
1 |
Cylinder—Cast Iron |
| 9 |
09-0008275 |
1 |
Plunger—Cold Rolled Steel |
| 10 |
10-0001146 |
2 |
Drive Screw |
| 11 |
11-0000434 |
2 |
Hex Hcl Cap Screw |
| 12 |
12-0046124 |
1 |
Link Pin—Steel—3/8” x 2” |
| 13 |
13-0081647 |
2 |
3/4” Check Valve |
| 14 |
14-0000984 |
2 |
3/4” x 2” Nipple—Galv. |
| 15 |
15-0026677 |
1 |
Handel Grip |
| 16 |
16-0000019 |
1 |
Pipe Plug—1/4” Brass |
| 17 |
17-0039905 |
4 |
Push Nut |
| 18 |
18-0000011 |
1 |
Name Plate |
PLEASE ORDER BY PART NUMBER
Subject to change without notice
Recommended Procedure to Change out Packing on the 594 TITAN Hydraulic Pressure Test Pump
- Disconnect Lever (7) from Plunger (9).
- Remove Packing Gland (5) and set aside.
- Remove all five rings of old packing (a picking tool or flat head screw driver works).
- Clean any dirt or debris from the packing box housing area (a solvent works well).
- Dry out the packing box housing with a clean cloth.
- Install five each new rings of Gland Packing (6), P/N TI2 06-0008272.
- Install each ring of packing so that the “joints” are offset 90 degrees from one another.
- Reassemble pump in reverse order.
Note:
The plunger needs to be installed before installing new packing. This allows the packing to wrap around
the plunger. The packing gland can be used to press the packing into the stuffing box.